You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Pothole in outside lane of the blackwall tunnel southern approach road split my rear driver side tyre and wheel rim buckled.

Reported in the Pothole (minor) category anonymously at 12:20, Wed 19 August 2020

Sent to TfL 9 hours, 1 minute later. TfL ref: FMS2253429.

I hit a pot hole in the outside lane of the blackwall tunnel southern approach road. My rear driver side tyre split and the wheel rim buckled. We had to cross three lanes of traffic to stop in a side road. The police attended and the aa replaced my wheel.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report. We have re categorised this and it will now be directed to the appropriate team to resolve.

    Category changed from ‘Pothole’ to ‘Pothole (minor)’

    Posted by TfL at 21:21, Wed 19 August 2020

  • Your report has been investigated and we have reported this to our contractors. If this confirmed as safety issue it will be made safe within 24 hours. A permanent repair, if needed, will be carried within our next programmed works for the area or sooner if we can. Thank you for taking the time to report this to us. Should you need anything else or have any questions please contact customer services on 0343 222 1234

    State changed to: Fixed

    Posted by TfL at 10:07, Thu 20 August 2020

This report is now closed to updates. You can make a new report in the same location.