Fixed
Missing kerb drops
Reported via Android in the Pavement Defect (uneven surface / cracked paving slab) category anonymously at 11:48, Mon 23 November 2020
Sent to TfL less than a minute later. TfL ref: FMS2401152.
I cannot cross the junction of York Road and York Place because there are no kerb drops and I use a wheelchair. Please introduce kerb drops here.
Updates
-
Thank you for your report. This will now be investigated by our team and we will update on progress within 10 days. If the issue you have reported is an emergency we will aim to update you on progress within 24 hours
State changed to: In progress
Posted by TfL at 17:34, Fri 27 November 2020
-
Unfortunately we have not been able to fix this within the timescale that we originally told you. This is in progress and we hope to have it fixed soon. Should you need anything else or have any questions please contact customer services on 0343 222 1234
State changed to: Fixed
Posted by TfL at 12:15, Wed 13 January 2021
-
Your report has been investigated and we have reported this to our contractors. If this confirmed as a safety issue this will be made safe within two hours. If a permanent repair is required, we will aim to carry it out within 28 days. Thank you for taking the time to report this to us. Should you need anything else or have any questions please contact customer services on 0343 222 1234
To note all Action Scheduled reports are auto closed after 28 days, the fault however will be fixed within the timescale stated above which may be sooner or in a few cases take a little longer.
State changed to: Action scheduled
Posted by TfL at 14:28, Wed 13 January 2021
-
Your report has been investigated and we have reported this to our contractors. If this confirmed as a safety issue this will be made safe within two hours. If a permanent repair is required, we will aim to carry it out within 28 days. Thank you for taking the time to report this to us. Should you need anything else or have any questions please contact customer services on 0343 222 1234
To note all Action Scheduled reports are auto closed after 28 days, the fault however will be fixed within the timescale stated above which may be sooner or in a few cases take a little longer.
Posted by TfL at 10:01, Wed 20 January 2021
-
Our routine inspections had already picked up this issue and it has been resolved. Thank you for taking the time to report this to us. Should you need anything else or have any questions please contact customer services on 0343 222 1234
State changed to: Fixed
Posted by TfL at 09:08, Mon 25 January 2021
-
Your report has now been resolved. Thank you for taking the time to report this to us. Should you need anything else or have any questions please contact customer services on 0343 222 1234
Posted by TfL at 09:09, Mon 25 January 2021
-
A gradient has been introduced on this kerb, but it is a botched job, as the slope is too short and too steep. I very nearly tipped backwards in my wheelchair today because of the sudden steepness of the gradient. If I had tipped back fully, I could have sustained serious head injuries. Please introduce a safe, standard and appropriate kerb drop here, along with the standard obligatory tactile paving as well.
Posted anonymously at 17:47, Tue 2 March 2021
This report is now closed to updates. You can make a new report in the same location.