Crossing not put back after Thames water flooding

Reported via mobile in the Pavement Defect (uneven surface / cracked paving slab) category anonymously at 17:37, Thu 31 December 2020

Sent to TfL less than a minute later. TfL ref: FMS2455646.

There was a crossing here to allow us to get to the park or the bus stop but it seems after the remedial works were done to the road after the recent burst water main, no one thought to put it back!

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Still not replaced. No where sensible to cross the road for Norman Park or to get to the bus stop. Accident waiting to happen

    Posted anonymously at 21:50, Sun 3 January 2021

  • Thank you for your report. This will now be investigated by our team and we will update on progress within 10 days. If the issue you have reported is an emergency we will aim to update you on progress within 24 hours

    State changed to: In progress

    Posted by TfL at 16:51, Tue 5 January 2021

  • Your report has been investigated and we have reported this to our contractors. If this confirmed as a safety issue this will be made safe within two hours. If a permanent repair is required, we will aim to carry it out within 28 days. Thank you for taking the time to report this to us. Should you need anything else or have any questions please contact customer services on 0343 222 1234

    To note all Action Scheduled reports are auto closed after 28 days, the fault however will be fixed within the timescale stated above which may be sooner or in a few cases take a little longer.

    State changed to: Action scheduled

    Posted by TfL at 12:52, Fri 22 January 2021

  • Your temporary bollards that your contractors have put as a temporary island has been causing me a major problem because its been put level with the entrance to my drive so its making it very dangerous when turning right due to being a very busy road can someone please respond to this message as its the third time and no response

    Posted anonymously at 16:16, Tue 26 January 2021

  • Still waiting for a response about bollards on bromley common made to be a temporary island that has been causing me a major problem when turning right and after 4 times sending a message still no reply [ totally disgusted with TFLs attitude ]

    Posted anonymously at 09:47, Wed 3 February 2021

  • The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234

    State changed to: Fixed

    Posted by TfL at 05:32, Sat 20 February 2021

This report is now closed to updates. You can make a new report in the same location.