Back to all reports

Damage to road,footpath and railing

Reported via mobile in the Roadworks category anonymously at 07:45, Saturday 10 April 2021

Sent to TfL less than a minute later. TfL ref: FMS2663080.

The bridge contractors are messy. Oil spills not dealt with, tarmac residue all over road. Road surface damaged. Barrier damaged to green. I have more photos. Also, why are your contractors laying damaged slabs on the bridge? The standard of paving is poor with trips appearing already, high lids and large gaps not pointed but sanded. The mess where contractors plant was parked has been left like it for over 2 weeks . This is poor as the workmen walk by it and could easily get a brush and shovel but don't.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

Provide an update

Please note that updates are sent to Transport for London. Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a Street Care password?