Collapsed drain / road subsidence

Reported via desktop in the Pavement Defect (uneven surface / cracked paving slab) category anonymously at 14:54, Thursday 5 August 2021

Sent to TfL less than a minute later. TfL ref: FMS2916742.

Photo of this report zoom

Redact

I want to cry, my home feels like its on a kids trampoline on a 6yr's birthday.

Now even small cars shakes my home, now I cannot sleep because its now affecting my bedroom.

The vibration from traffic shakes my house 24/7, there is no escape from it! My doctor has prescribed me anti anxiety drugs because of this.

I have been on to my MP about this, only one man hole has been filled. This manhole was patched at the start of the year and its already deteriorated.

This section of road suffers from a collapsed drain/subsidence and needs to be resurfaced.

Please resurface this road!

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for taking the time to report this to us. It is much appreciated. This has been investigated and has now been referred to our contractors. If this defect is confirmed as a safety issue this will be made safe within two hours. If a permanent repair is required, we will aim to carry it out within 28 days. Should you need anything else or have any questions, you may wish to contact our customer services team on 0343 222 1234

    Please also be aware that, all Action Scheduled reports are automatically closed after 28 days. However, the fault will be fixed within this timescale, which may be sooner, or in a few cases take a little longer

    State changed to: Action scheduled

    Posted by TfL at 11:24, Friday 6 August 2021

  • The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234

    State changed to: Fixed

    Posted by TfL at 05:32, Saturday 4 September 2021