You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new
report here
Reposition
report here
Back to all reports

All drains between Edge Hill Av and Beechwood Av are BLOCKED

Reported via desktop in the Blocked drain category anonymously at 12:28, Saturday 7 January 2023

Sent to TfL less than a minute later. TfL ref: FMS4097909.

15-20 drains (every drain between Edge Hill Av and Beechwood Av) on the Eastbound carriage way of A406 are FULLY blocked with builders sand and debris from the Edgewood Mews Construction project (see photos). This creates flooding on the A406 and is causing splash back damage to the building. These drains need to be unblocked as a matter of urgency for safety reasons, to allow pedestrians to use the footpath when raining and protect the residents from further damage to their building.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • All drains remain blocked. Damage to building continues to get worse. Hazardous conditions on inside lane of A406 when raining due to pools of water.

    Posted anonymously at 15:39, Thursday 12 January 2023

  • Why is TFL ignoring this report? The drains are still totally blocked. This is dangerous for drivers and pedestrians and is damaging residential property.

    Posted anonymously at 09:58, Saturday 28 January 2023

  • Thank you for taking the time to report this to us. We appreciate this. This has now been investigated and we’ve reported this to our contractors. If the blocked drain is identified as a safety issue it will be made safe within four hours. If it isn't a safety issue, we will aim to resolve it within 28 days. Should you need anything else, or have any questions, you may wish to contact our customer services team on 0343 222 1234.

    Please also be aware that all Action Scheduled reports are automatically closed after 28 days. However, we aim to fix the fault within this timescale, which may be sooner, or in a few cases take a little longer.

    State changed to: No further action

    Posted by TfL at 11:39, Tuesday 14 February 2023

This report is now closed to updates. You can make a new report in the same location.