You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Uneven pavement

Reported via mobile in the Pavement Defect (uneven surface / cracked paving slab) category anonymously at 16:26, Tuesday 31 January 2023

Sent to TfL less than a minute later. TfL ref: FMS4190241.

Pavement is starting to sink outside 150 Uxbridge road Tw135ea

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for taking the time to report this to us. It is much appreciated. This has been investigated and has now been referred to our contractors. If this defect is confirmed as a safety issue this will be made safe within two hours. If a permanent repair is required, we will aim to carry it out within 28 days. Should you need anything else or have any questions, you may wish to contact our customer services team on 0343 222 1234

    Please also be aware that, all Action Scheduled reports are automatically closed after 28 days. However, the fault will be fixed within this timescale, which may be sooner, or in a few cases take a little longer

    State changed to: Action scheduled

    Posted by TfL at 08:46, Wednesday 1 February 2023

  • Gang has come out and replaced one slab

    Still Unlevel

    And now even worse than it was before the repair as sticking up and a trip hazard

    As the street lights have been out for a long time at night you won’t be able to see the floor and will have a accident with a poor repair job as now dangerous

    Posted anonymously at 13:01, Wednesday 8 February 2023

  • Have asked for a repair , no repair has been carried out ? Pavement still uneven and sunk now a new slab has been put in wrong place and is loose and is raised potentially a trip hazard or accident awaiting to happen crews attended at around 2 am really loud ? And have not completed work as requested and reported now even more dangerous please advise and see pictures this is not professional at all

    Posted anonymously at 18:42, Wednesday 8 February 2023

  • Please see attached, no difference

    Posted anonymously at 18:44, Wednesday 8 February 2023

  • Still a trip hazard

    Please can an update be provided about how workers have been sent out and have made this even worse ?

    Very unprofessional for TFL

    The slip road is in a very poor state and badly maintained this needs to be sorted

    Leafs blocked drains tarmac coming away multiple reports to TfL and still nothing

    Not good TfL

    Posted anonymously at 17:30, Monday 20 February 2023

  • Still the same please can an update be added on this job

    Posted anonymously at 13:50, Thursday 23 February 2023

  • Still in a dangerous condition please can an update be provided as soon as practicable within regards to this matter

    Posted anonymously at 09:37, Monday 27 February 2023

  • The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234

    State changed to: Fixed

    Posted by TfL at 05:32, Thursday 2 March 2023

This report is now closed to updates. You can make a new report in the same location.