Water repairs

Reported via desktop in the Roadworks category anonymously at 09:41, Thu 4 May 2023

Sent to TfL less than a minute later. TfL ref: FMS4515744.

Repair carried out within a couple of days but the road surface is still awaiting repair with nothing done for several days since water main repair has been completed. There are temporary lights which result in long traffic queues creating considerable traffic fumes and pollution as well as noise of stationary traffic. Totally unacceptable for local residents as it noticeably impacts health. There is absolutely no excuse for the surface not to be mended and the road opens. Thames Water are consistently guilty of exactly this problem and must be told that it is unacceptable. The road should be opened immediately that the water main is repaired and not after several more days!

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting us. These works are due to be completed 05/05/2023.

    State changed to: Action scheduled

    Posted by TfL at 14:23, Thu 4 May 2023

  • The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234

    State changed to: Fixed

    Posted by TfL at 05:32, Fri 2 June 2023

This report is now closed to updates from the public. You can make a new report in the same location.