Fixed
Damaged Traffic Control Bollard and and kerbing
Reported via desktop in the Pavement Defect (uneven surface / cracked paving slab) category anonymously at 14:17, Thu 25 May 2023
Sent to TfL less than a minute later. TfL ref: FMS4595687.
Tuesday 23rd May 2023 at 3.29pm. Vehicle existing Great Suffolk Street and turning onto Southwark Street in the direction of London Bridge. Collided with traffic control bollard (partially drove over it) and damaged paving and kerbing. Vehicle details can be supplied if required.
Updates
-
Thank you for taking the time to report this to us. It is much appreciated. This has been investigated and has now been referred to our contractors. If this defect is confirmed as a safety issue this will be made safe within two hours. If a permanent repair is required, we will aim to carry it out within 28 days. Should you need anything else or have any questions, you may wish to contact our customer services team on 0343 222 1234
Please also be aware that, all Action Scheduled reports are automatically closed after 28 days. However, the fault will be fixed within this timescale, which may be sooner, or in a few cases take a little longer
State changed to: Action scheduled
Posted by TfL at 09:07, Sun 28 May 2023
-
The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234
State changed to: Fixed
Posted by TfL at 05:32, Mon 26 June 2023