Closed
SGN Works - Poor Finish - Missing Paving Stones
Reported via desktop in the Roadworks category by Simon Thomas at 08:45, Fri 22 September 2023
Sent to TfL less than a minute later. TfL ref: FMS5020133.
There were some works carried out I believe by SGN and they have just finished a couple weeks ago. However I noticed that they have not replaced the paving stones and done a quick 'n' dirty patch with tarmac, it looks terrible.
Now I dont know about you but as a tax payer this unacceptable. These bricks were laid at the expense of the tax payer and now we just remove them and put cheap tarmac down?
Where is the quality control here, non existent.
The same can be said where the bike stands are and the drinking fountain, a quick 'n' dirty fix which makes the area look terrible!
Rectify ASAP!
Updates
-
Thank you for taking the time to report this to us. It is much appreciated. Our team had investigated this for you and found that this doesn't fall under the responsibility of Transport for London and comes under the remit of the local borough. You may therefore wish to report this issue by using www.fixmystreet.com, or directly to the borough. Should you need anything else, please contact our customer services team on 0343 222 1234
State changed to: not TfL’s responsibility
Posted by TfL at 07:54, Tue 26 September 2023
This report is now closed to updates from the public. You can make a new report in the same location.