You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Lorry took out the light

Reported via desktop in the Damage - pole leaning / equipment detached from pole/facing the wrong direction category anonymously at 10:30, Wednesday 27 March 2024

Sent to TfL less than a minute later. TfL ref: FMS5772291.

A lorry hgv reg no Nx6bucg tried to turn left into creek road from Deptford church street. He was however in the right hand filter lane and because of the length of his vehicle ( it was a male driver) smashed the traffic light as he turned. It was a large flatbed hgv with parts of a crane on the back- ie huge tank tracks & a big yellow box frame for part of the crane. It happened at approximately 10.15am this morning

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for taking the time to report this to us. It is much appreciated. This has now been investigated and we can confirm that there is a fault with these traffic lights. We have therefore passed this to our contractors and as it is classed as an emergency. It will be made safe within 24 hours. Should you need anything else, or if you have any questions, you may wish to contact our customer services team on 0343 222 1234

    Please also be aware that, all Action Scheduled reports are automatically closed after 28 days. However, the fault will be fixed within this timescale, which may be sooner, or in a few cases take a little longer.

    State changed to: Action scheduled

    Posted by TfL at 11:16, Wednesday 27 March 2024

  • The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234

    State changed to: Fixed

    Posted by TfL at 05:32, Thursday 25 April 2024

This report is now closed to updates from the public. You can make a new report in the same location.