Fixed
1.5M wide pothole seen from Google Map!
Reported via mobile in the Pothole (major) category by F 2410 at 15:47, Fri 19 April 2024
Sent to TfL less than a minute later. TfL ref: FMS5875465.
The section of concern is just after exiting the tunnel of Greenman Interchange, heading towards Leyton/Leytonstone from Redbridge Roundabout. For the past two months, significant potholes, some as large as 1 to 2 meters in length and 40 to 70 cm deep, have been plaguing this area, posing a grave hazard to motorists.
Unfortunately, due to high traffic and safety concerns, it's challenging to stop and capture images. However, I can provide a screenshot pinpointing the approximate location of these hazardous potholes.
Given the potential dangers and the duration of this issue, urgent remedial action is imperative to ensure the safety of all road users and prevent traffic disruptions.
Updates
-
Thank you for taking the time to report this to us. It is much appreciated. We have investigated this, and it has now been referred to our contractors. If the defect is confirmed as a safety issue, it will be made safe within 24 hours. A permanent repair, if needed will be carried out during our next programmed works for the area, or sooner if we can. Should you need anything else or have any questions, you may wish to contact our customer services team on 0343 222 1234
Please also be aware that, all Action Scheduled reports are automatically closed after 28 days. However, the fault will be fixed within this timescale, which may be sooner, or in a few cases take a little longer
State changed to: Action scheduled
Posted by TfL at 17:41, Fri 19 April 2024
-
The action scheduled for your report should now have been completed as detailed in your previous response. On some occasions it does take a little longer than scheduled. If you have any further queries on this, please either create a new report or contact our Customer Contact Centre on 0343 222 1234
State changed to: Fixed
Posted by TfL at 05:32, Sat 18 May 2024
This report is now closed to updates from the public. You can make a new report in the same location.